Did you know that, to date, Svevind has been granted permission for 1,176 sites for wind turbines?
Click on each project to find out more.
Markbygden ETT
179 TURBINES 200 m TOTAL HEIGHT 650 MW INSTALLED EFFECT 2,2 TWH ANNUAL ESTIMATED PRODUCTION Markbygden ETT is the third sub-project of Phase 1 [...]
Skogberget
36 TURBINES 184 m TOTAL HEIGHT 84 MW INSTALLED EFFECT 250 GWH ANNUAL ESTIMATED PRODUCTION Skogberget is the first sub-project realised in Phase 1 [...]
Ersträsk
68 TURBINES 200 m TOTAL HEIGHT 183 MW INSTALLED EFFECT - TWH ANNUAL ESTIMATED PRODUCTION Ersträsk is the second sub-project of Phase 1 of [...]
Gabrielsberget
40 TURBINES 149 m TOTAL HEIGHT 92 MW INSTALLED EFFECT 240 TWH ANNUAL ESTIMATED PRODUCTION In 2008, Svevind was granted permission to erect and [...]
Hörnefors
6 TURBINES 149 m TOTAL HEIGHT 12 MW INSTALLED EFFECT 30 GWH ANNUAL ESTIMATED PRODUCTION In spring of 2003, Svevind was granted permission to [...]
Dragaliden
12 TURBINES 179/149 m TOTAL HEIGHT 24 MW INSTALLED EFFECT 70 GWH ANNUAL ESTIMATED PRODUCTION Markbygden Vind AB applied for and was granted permission [...]