Did you know that, to date, Svevind has been granted permission for 1,176 sites for wind turbines?
Click on each project to find out more.
Markbygden Phase 3
442 TURBINES 200 m TOTAL HEIGHT 1400 MW INSTALLED EFFECT 5,5 TWH ANNUAL ESTIMATED PRODUCTION Phase 3 is the third, final, but potentially largest, [...]
Markbygden Phase 2
440 TURBINES 200 m TOTAL HEIGHT 1300 MW INSTALLED EFFECT 3,5 TWH ANNUAL ESTIMATED EFFECT Phase 2 is the second stage of the Markbygden [...]
Hästliden
- TURBINES - m TOTAL HEIGHT - MW INSTALLED EFFECT - TWH ANNUAL ESTIMATED EFFECT Hästliden is a subproject of Markbygden Phase 3. The [...]
Önusberget
137 TURBINES 200 m TOTAL HEIGHT 750 MW INSTALLED EFFECT - TWH ANNUAL ESTIMATED EFFECT Önusberget is a subproject of Markbygden Phase 3 and [...]
Markbygden ETT
179 TURBINES 200 m TOTAL HEIGHT 650 MW INSTALLED EFFECT 2,2 TWH ANNUAL ESTIMATED PRODUCTION Markbygden ETT is the third sub-project of Phase 1 [...]
Skogberget
36 TURBINES 184 m TOTAL HEIGHT 84 MW INSTALLED EFFECT 250 GWH ANNUAL ESTIMATED PRODUCTION Skogberget is the first sub-project realised in Phase 1 [...]