Project Description

442

TURBINES

200 m

TOTAL HEIGHT

1400 MW

INSTALLED EFFECT

5,5 TWH

ANNUAL ESTIMATED PRODUCTION

Phase 3 is the third, final, but potentially largest, stage of the Markbygden 1101 project, located between the villages of Långträsk, Hultet and Önusberget in the central and south-easternpart of the Markbygden area. Phase 3 is divided into two sub-projects, Hästliden and Önusberget.

Phase 3 was granted permission in June 2018 for the erection of up to 442 wind turbines in an area of roughly 160 km2.

The Önusberget project was transferred to a third party in summer 2019, while Hästliden is in the final planning phase for realisation within the next year.

All figures and values (above) relating to the number of turbines, outputrated power, and estimated production are preliminary and may change during the project’s completion.