Project Description

440

TURBINES

200 m

TOTAL HEIGHT

1300 MW

INSTALLED EFFECT

3,5 TWH

ANNUAL ESTIMATED EFFECT

Phase 2 is the second stage of the Markbygden 1101 project, located at the north-western part of the Markbygden area. Phase 2 was granted permission in February 2016 for the erection of up to 440 wind turbines in an area of roughly 160 km².

Transferred: This project has been transferred to a third party in 2015.

All figures and values (above) relating to the number of turbines, outputrated power, and estimated production are preliminary and may change during the project’s completion.