Project Description

314

TURBINES

200 m

TOTAL HEIGHT

917 MW

INSTALLED EFFECT

3 TWH

ANNUAL ESTIMATED PRODUCTION

Phase 1 is the first phase of the Markbygden 1101 project, located at the north-eastern part of the Markbygden area. Phase 1 is divided into three sub-projects, Ersträsk, Markbygden ETT and Skogberget all of the three sub-projects are in operation or under construction.
Phase 1 was granted permission in October 2012 for the erection of up to 314 wind turbines in an area of roughly 140 km2.
Transferred: This project has been split and transferred to third parties.

All figures and values (above) relating to the number of turbines, outputrated power, and estimated production are preliminary and may change during the project’s completion.