Project Description
179
TURBINES
200 m
TOTAL HEIGHT
650 MW
INSTALLED EFFECT
2,2 TWh
ANNUAL ESTIMATED PRODUCTION
Markbygden ETT is the third sub-project of Phase 1 of Markbygden 1101 and consists of 179 wind turbines with a combined rated power of 650MW that are scheduled for final commissioning in 2020.
Transferred: This project has been transferred to a third party in 2017.
All figures and values (above) relating to the number of turbines, outputrated power, and estimated production are preliminary and may change during the project’s completion.