Project Description
6
TURBINES
100 m
TOTAL HEIGHT
12 MW
INSTALLED EFFECT
30 GWh
ANNUAL ESTIMATED PRODUCTION
In the spring of 2003, Svevind was granted permission to erect six wind turbines at Granberget, north of Sikeå in the municipality of Robertfors. All six wind turbines with a combined rated power of 12MW have been in operation since 2009.
Transferred: This project has been transferred to a third party.
