Project Description
40
TURBINES
149 m
TOTAL HEIGHT
92 MW
INSTALLED EFFECT
240 GWh
ANNUAL ESTIMATED PRODUCTION
In 2008, Svevind was granted permission to erect and operate 40 wind turbines at a site called Gabrielsberget in the municipality of Nordmaling. In early 2011, the first 20 wind turbines with a combined rated power of 46 MW were erected and commissioned by Gabrielsberget Syd Vind AB, with the remaining 20 turbines with a combined rated power of 46 MW being erected in 2012 by Gabrielsberget Nord Vind AB. The entire wind farm has been fully operational since the summer of 2012.
Divested: This project has been divested to third parties in 2022.