Wind farm | No. WTG | Rated power | COD |
Wind farms under operation | |||
Dragaliden-I | 2 | 4.0 | 2008 |
Dragaliden-II | 10 | 20.0 | 2010 |
Skogberget | 36 | 84.6 | 2013/2014 |
Markbygden Ett | 179 | 649.8 | 2019 |
Stor Blaliden-I | 2 | 6.0 | 2019 |
Stor Blaliden-II | 1 | 5.3 | 2020 |
Ersträsk-I (SOUTH) | 26 | 61.1 | 2018/2019 |
Ersträsk-II (SOUTH) | 10 | 40.0 | 2020 |
MB2 NORTH | 63 | 252.7 | 2021 |
total | 329 | 1123.5 | |
Wind farms under construction | |||
Stor Blaliden-III | 2 | 11.6 | 2022 |
Stor Blaliden-IV | 1 | 5.8 | 2022 |
MB2 SOUTH | 135 | 540 | 2023 |
Aura | 137 | 753.5 | 2023 |
Ersträsk-III (NORTH) | 32 | 128 | 2022 |
Subtotal | 307 | 1438.9 |